4.7 Work Package Orchestration
Work packages are largely intended as a means for quality control of the results of work
of the research themes. The work packages 1 and 5 (management and dissemination) run
for the whole life cycle of the programme. The three ‘core’ work packages 2, 3 and 4
have started in December 2002 and are active until the end of the programme. The work
package 1 has started at the beginning of the programme and will stop after two years.
Figure 1.2 indicates the approximate periods of activity within the work packages.
|
|
1.1
|
1.2
|
1.3
|
1.4
|
2.1
|
2.2
|
2.3
|
2.4
|
|
|
June
2002
|
|
June
2003
|
|
June
2004
|
|
June
2005
|
|
|
|
T0+0
|
T0+6
|
T0+12
|
T0+18
|
T0+24
|
T0+30
|
T0+36
|
T0+42
|
|
WP0
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WP1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WP2
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WP3
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WP4
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
WP5
|
|
|
|
|
|
|
|
|
Figure 1.2: M-Zones Phase 1 &2 work package activity
WP1 will provide the initial focus of activity with a review the state of the art. WP1 has a
cycle of 18 months along the typical time line of major technological changes. The main
research and design work packages, WP2 to WP4, have been in the second and third
quarter of 2002 respectively, once the review of state of the art has delivered the initial
focus and the main body of research staff are available.
Figure 1.3 shows the distribution of deliverables for each work package. These
deliverables are structured along the work packages to allow quality control of the
research work. Work package leaders are responsible for ensuring the quality of research
theme contributions to these deliverables related to the aspect the work package
addressed. Work package leaders will therefore have to work closely with research theme
coordinators in the deliverable editing process. Every year one of the WP2/3/4
deliverables will coincide with the annual report and provide supporting information for
it.
These deliverables are combined with workshops to circulate the new developments and
knowledge between all partners and between invited or interested international research
groups. For the deliverables and the workshops we suggest the following mechanism. We
will have four meetings a year. The first meeting, mid of February, is an internal M-Zone
meeting that prepares the first report of the three work packages. The second meeting,
scheduled for the first week of May provides a workshop where the reports of the work
packages are presented and where a work plan for the next 6 months is to be agreed. The
actual reports must be provided prior to this meeting. The next two meetings, scheduled
for the start of September and the beginning of November, are used to prepare and to
present the next series of reports. Following this scheme, all work packages (2-4) publish
their reports on the same meeting by means of a workshop twice a year. Depending on the
actual outcome of the work in a work package, the focus of a workshop can be assigned
dynamically. This scheme provides the necessary freedom for the basic research the
programme dedicated to without loosing the possibility of a permanent control of the
quality of the research work.
|
month no.
|
date
|
WP0
Programme Management
|
WP1
SoA
|
WP2
Architectural Approaches
|
WP3
Modelling and Design
|
WP4
Experimentation Platforms
|
WP5
Evaluation and Dissemination
|
|
7
|
Dec-02
|
|
|
|
|
|
|
|
8
|
Jan-03
|
|
|
|
|
|
|
|
9
|
Feb-03
|
|
D1.1
|
|
|
|
|
|
10
|
Mar-03
|
|
|
|
|
|
|
|
11
|
Apr-03
|
|
|
|
|
|
|
|
12
|
May-03
|
D0.1
|
|
|
|
|
|
|
13
|
Jun-03
|
|
|
D2.1
|
D3.1
|
D4.1
|
|
|
14
|
Jul-03
|
|
|
|
|
|
|
|
15
|
Aug-03
|
|
|
|
|
|
|
|
16
|
Sep-03
|
|
|
|
|
|
|
|
17
|
Oct-03
|
|
|
|
|
|
|
|
18
|
Nov-03
|
|
|
D2.2
|
D3.2
|
D4.2
|
|
|
19
|
Dec-03
|
|
|
|
|
|
|
|
20
|
Jan-04
|
|
|
|
|
|
|
|
21
|
Feb-04
|
|
|
|
|
|
|
|
22
|
Mar-04
|
|
|
|
|
|
|
|
23
|
Apr-04
|
|
|
D2.3
|
D3.3
|
D4.3
|
|
|
24
|
May-04
|
D0.2
|
|
|
|
|
|
|
25
|
Jun-04
|
|
|
|
|
|
|
|
26
|
Jul-04
|
|
|
|
|
|
|
|
27
|
Aug-04
|
|
|
|
|
|
|
|
28
|
Sep-04
|
|
|
|
|
|
D5.1
|
|
29
|
Oct-04
|
|
|
|
|
|
|
|
30
|
Nov-04
|
|
|
D2.4
|
D3.4
|
D4.4
|
|
|
31
|
Dec-04
|
|
|
|
|
|
|
|
32
|
Jan-05
|
|
|
|
|
|
|
|
33
|
Feb-05
|
|
|
|
|
|
|
|
34
|
Mar-05
|
|
|
|
|
|
|
|
35
|
Apr-05
|
|
D1.2
|
D2.5
|
D3.5
|
D4.5
|
D5.2
|
|
36
|
May-05
|
D0.3
|
|
|
|
|
|
|
37
|
Jun-05
|
|
|
|
|
|
|
|
38
|
Jul-05
|
|
|
|
|
|
|
|
39
|
Aug-05
|
|
|
|
|
|
|
|
40
|
Sep-05
|
|
|
|
|
|
|
|
41
|
Oct-05
|
|
|
|
|
|
|
|
42
|
Nov-05
|
|
|
D2.6
|
D3.6
|
D4.6
|
|
|
43
|
Dec-05
|
|
|
|
|
|
|
|
44
|
Jan-06
|
|
|
|
|
|
D5.3
|
|
45
|
Feb-06
|
|
|
|
|
|
|
|
46
|
Mar-06
|
|
|
|
|
|
|
|
47
|
Apr-06
|
|
|
D2.7
|
D3.7
|
D4.7
|
|
|
48
|
May-06
|
D0.4
|
|
|
|
|
|
Figure 1.3: Distribution of Deliverables
|